Case study
120 kW DC Fast Charging at The Fern Residency, Godhra
Discover how a 120 kW DC fast-charging installation at The Fern Residency in Godhra combines dual CCS2 connectors, connected charging infrastructure, and roaming capabilities to support commercial EV charging at a hospitality destination.

Approximate reported charging revenue for the 30-day period Copy
₹25,000+
Energy delivered in the reported 30-day period Copy
1000+ kWh
DC fast-charging capacity Copy
120 kW
Problem
Hotels and hospitality destinations are increasingly looking for ways to accommodate electric vehicle users while preparing their properties for the shift towards electric mobility. However, introducing high-power EV charging requires more than installing a charger. Operators need suitable charging hardware, convenient connector access, network connectivity, and effective tools to monitor and manage charging operations.
Without an integrated charging management approach, overseeing charger availability, charging sessions, and station performance can become more challenging as EV usage grows.
Solution
The Fern Residency in Godhra, Gujarat, features a 120 kW Compact DC 120D fast charger manufactured by Chargesetu, equipped with two CCS2 connectors and roaming capabilities.
Savekar CMS can provide a centralized platform for connected charging infrastructure, enabling operators to monitor charger status, access charging-session information, and review available station performance data.
For hospitality businesses, this combination of high-power charging hardware and connected management capabilities can support a more organized charging operation while creating opportunities to serve EV drivers visiting or stopping at the property. Roaming functionality can also support charging access across compatible networks, subject to the relevant integrations.
The deployment illustrates how hospitality destinations can incorporate DC fast charging as part of their wider commercial EV infrastructure strategy.
Results
Charging Revenue
₹25,000+
Reported charging revenue for the supplied 30-day reporting period.
CCS2 Charging Connectors
2
Dual CCS2 connector configuration for compatible EVs, supporting a flexible destination-charging setup.
Energy Delivered
1000+ kWh
Total electricity delivered to EVs during the supplied 30-day reporting period.
More success stories
View all
Case studyCommercial EV Charging for Electric Auto Rickshaws in Kochi
Explore how commercial EV charging infrastructure in Kochi can support electric auto-rickshaws and commercial mobility, with connected charging hardware and centralized station management through Savekar CMS.
Case studySmondo 3.0 Apartments, Bengaluru – Residential EV Charging
Discover how EV charging infrastructure at Smondo 3.0 Apartments in Bengaluru supports residential electric mobility with connected 7.4 kW AC charging hardware from Bolt.Earth.
Case studyBhairavgarh Palace Udaipur: WhatsApp + UPI Charging
A hillside palace hotel deployed AC chargers with WhatsApp + UPI, reaching 380 monthly sessions and 98.7% payment success while reducing front-desk workload.